Breaks Substation Pad Construction
Location: Elkhorn City, KY
Project Description
- 6 acre substation pad construction in very rugged terrain
- 50,000 cubic yards of embankment and required import of over 10,000 cubic yards of earthen material
- Installation of 700 linear feet of soldier pile retaining wall 16 feet in height
- Remediation and mitigation of mountainside slip caused by below grade natural springs and seeps
- Placement of over 45,000 square yards of geo-grid reinforcing material
- Required removal of unforeseen concrete structure extending to 25 feet below grade