Erie-Ottawa Regional Airport Expansion and Improvements
Location: Port Clinton, OH
Project Description
- Performed excavation and embankment for runway the taxiway expansion and safety area
- Excavation and embankment in excess of 35,000 cubic yards of on-site soil
- Imported approximately 20,000 cubic yards of soil material
- Installed drainage systems totaling 13,000 linear feet of storm conduit
- Widened existing 4,500 feet runway (15′ additional asphalt shoulder added to each side)
- Pavement overlay of 5,000 linear feet of main runway
- Constructed concrete apron area consisting of 11" concrete pavement with embedded aircraft tie-down anchors
- Temporary and permanent pavement markings were placed
- Installed and established the relocated threshold for each project
- Project was completed under strict security and operational constraints