  • Performed excavation and embankment for runway the taxiway expansion and safety area
  • Excavation and embankment in excess of 35,000 cubic yards of on-site soil
  • Imported approximately 20,000 cubic yards of soil material
  • Installed drainage systems totaling 13,000 linear feet of storm conduit
  • Widened existing 4,500 feet runway (15′ additional asphalt shoulder added to each side)
  • Pavement overlay of 5,000 linear feet of main runway
  • Constructed concrete apron area consisting of 11" concrete pavement with embedded aircraft tie-down anchors
  • Temporary and permanent pavement markings were placed
  • Installed and established the relocated threshold for each project
  • Project was completed under strict security and operational constraints