Arrowhead Substation Site Work


Location: Abingdon, VA

 

Project Description

  • Kwest Group performed the required grading, erosion control and water main relocation for this project located in southwest Virginia
  • The project involved the on-site balance of earthen material as well as the import of additional embankment material. Rock was removed to achieve design subgrade elevations
  • Project scope included construction of entrance road and guardrail
  • Kwest Group crews also installed/relocated 12″ and 24″ ductile iron pipe water main to the adjacent Washington County Water Treatment Plant
  • A temporary drainage swale and storm water detention basin was installed by Kwest Group to divert storm runoff around the disturbed areas of the site
  • Silt fencing was installed and maintained for the duration of the project by Kwest Group
  • Seeding and final restoration was also completed by Kwest Group Personnel