City Lakes Substation Sitework
Location: Mt. Pleasant, Texas
Project Description
- New substation project required 6,100 cubic yards of cut to fill and exported excess soil to mound
- Installation of 1,105 cubic yards of flex base material for roads and pad
- Concrete paved entrances with 272 feet of 6' curb
- Placed 230 feet of 18” reinforced concrete pipe, 3 catch basins and cast-in-place headwall with wing walls
- Close coordination with the City of Mt. Pleasant to remove 494 feet of 16" water line and install 579 feet of relocated 16” water line
- Rip rap was placed on station slopes
- Installed 322 square yards of concrete paved channel