- Excavation to on-site placement of 100,000 cubic yards
- Approximately 12,000 cubic yards of topsoil stripping and placement
- Excavated and crushed nearly 130,000 cubic yards of rock
- 12 acres of seeding and mulching with straw blankets
- Installation of 10,000 linear feet of 6” underdrain
- 22 each 48” diameter drilled concrete shafts were placed for the stabilization wall (depths range 35’-65’)